Global Activities
Our activities in the Netherlands
Our headquarters are located in The Netherlands and we serve a lot of clients in our own country. On this page a selection of gearbox projects done in The Netherlands are included. More information about the project can be viewed by clicking on the links listed below.
The conversion operations consists of:
- Disassembling of the gearbox with the complete gearwheel on location.
- Transporting the gearbox to our fitting shop.
- Disassembling, cleaning and an inspection of the gearbox with complete gearwheel.
The conversion operations consists of:
- Disassembling of the gearbox with the complete gearwheel on location.
- Transporting the gearbox to our fitting shop.
- Disassembling, cleaning and an inspection of the gearbox with complete gearwheel.
The conversion operations consists of:
- Disassembling of the gearbox with the complete gearwheel on location.
- Transporting the gearbox to our fitting shop.
- Disassembling, cleaning and an inspection of the gearbox with the complete gearwheel.
The conversion operations consists of:
- Disassembling of the gearbox with the complete gearwheel on location.
- Transporting the gearbox to our fitting shop.
- Disassembling, cleaning and an inspection of the gearbox with complete gearwheel.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the output hollow shaft.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Controlling of the serrations and the output for bursts.
The follow instructions were produced at the gearbox:
The follow instructions were produced at the gearbox:
The follow instructions were produced at the gearbox:
The conversion operations consists of:
- A visual inspection of the gearbox with the aid of a videoscope through the inspection cover.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
- Preparing of a test run.
The conversion operations consists of:
- Inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of the damaged wear bushes.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling of the gearbox.
- Equalizing of the spur bevel gear.
- Performing of the repair constructions.
- Transporting the gearbox to our fitting shop.
- Disassembling, cleaning and an inspection of the gearbox with complete gearwheel.
ZPMC FB515.916.D1A-00
- Transporting the gearbox to our fitting shop.
- Disassembling, cleaning and an inspection of the gearbox with complete gearwheel.
ZPMC FB515.916.D1A-00
- Transporting the gearbox to our fitting shop.
- Disassembling, cleaning and an inspection of the gearbox with the complete gearwheel.
ZPMC FB515.916.D1A-00
- Transporting the gearbox to our fitting shop.
- Disassembling, cleaning and an inspection of the gearbox with complete gearwheel.
ZPMC FB515.916.D1A-00
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the output hollow shaft.
PHB K3 Szg 560
- Deploying of the inspection report.
- Stop point.
DELROYD KE80-44T-18,5
- Performing of the repair constructions.
- Deploying of the inspection report.
ZPMC ZP04-544-01
- Performing of the repair constructions.
- Controlling of the serrations and the output for bursts.
BUSS G-160
- Disassembling, cleaning, visual inspection and assembling. Test run with report.
- Renewing of various consumables such as gaskets and mounting hardware.
- Re-assembling of the gearbox.
ZPMC FB515.916.D1A-00
- Disassembling, cleaning, visual inspection and assembling. Test run with report.
- Renewing of all seals and bearings.
- Renewing of various consumables such as gaskets and mounting hardware.
ZPMC FB515.916.D1A-00
This presents the findings of the visual inspection, vibration analysis and shaft
alignment check, performed on the generator gearbox of Asug. For the
inspection of the gears and bearings of the gearbox, a videoscope was used.
Clear images can be viewed and recorded by a videoscope at locations with
limited accessibility.
alignment check, performed on the generator gearbox of Asug. For the
inspection of the gears and bearings of the gearbox, a videoscope was used.
Clear images can be viewed and recorded by a videoscope at locations with
limited accessibility.
ASUG STG-2-900
- Disassembling, cleaning, visual inspection and assembling. Test run with report.
- Renewing of various consumables such as gaskets and mounting hardware.
- Renewing of spur bevel gear set.
- Renewing of the pinion shaft.
FLENDER KBH 400/S/So
- Performing of the repair constructions.
- Deploying of the inspection report.
FLENDER H2-SV-7B
- Performing of the repair constructions.
- Deploying of the inspection report.
FLENDER FZAZ148 G180M4 L400
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
- Preparing of a test run.
FLENDER KBH 400/S/So
Checking all bearings of gearbox Flender by videoscope.
The bearings have scratches on the gears.
Making a roadmap for our client.
The bearings have scratches on the gears.
Making a roadmap for our client.
FLENDER H3-SH-19
- Performing of the repair constructions.
- Renewing of the damaged wear bushes.
ZPMC FH1690.21.C1B
- Deploying of the inspection report.
- Stop point.
KONE HSC-32252E-FY-500
Disassembling, cleaning and inspection.
Making a full inspection report.
Repairing the seals and bearings.
Performed a test run with a test run report.
Making a full inspection report.
Repairing the seals and bearings.
Performed a test run with a test run report.
FLENDER KDA 360
FLENDER H3-KH-8B
- Disassembling and complete visual inspection.
- Preparing a inspection report for our client in China.
- Test run with a test run report.
- Replacing the repaired gearbox.
- Preparing a inspection report for our client in China.
- Test run with a test run report.
- Replacing the repaired gearbox.
ZPMC FH1060.35.A2B
- Deploying of the inspection report.
- Stop point.
HANSEN 536
- Equalizing of the spur bevel gear.
- Performing of the repair constructions.
GSM UNKNOWN
We performed an inspection and revision on gearbox CONRAD STORK V 270.
Disassembled this gearbox and checked for any damage.
The bearings and seals had to be repaired.
The damage was repair by our engineers.
The gearbox was transported back to our client.
Disassembled this gearbox and checked for any damage.
The bearings and seals had to be repaired.
The damage was repair by our engineers.
The gearbox was transported back to our client.
CONRAD STORK V-270
Disassembling gearbox Flender NK NR SCH355/P/So.
After cleaning, we were able to perform a fully inspection.
The inside of the gearbox had te be repaired.
Our engineers repaired them and made a test run.
After cleaning, we were able to perform a fully inspection.
The inside of the gearbox had te be repaired.
Our engineers repaired them and made a test run.
FLENDER NK NR SCH355/P/So