Global Activities
Our activities in the Netherlands
Our headquarters are located in The Netherlands and we serve a lot of clients in our own country. On this page a selection of gearbox projects done in The Netherlands are included. More information about the project can be viewed by clicking on the links listed below.
Disassembling, cleaning and a inspection of the gearbox.
Controlling the inside for bursts.
Replacing of seals and bearings.
Renewing of the pinion shaft.
Location, day 1
- Breaking of the output coupling and cable drums.
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
The conversion operations consists of:
- A visual inspection, a test run and the complete installing of the gear on location.
- Preparing a test run in our working place for two hours.
- Disassembling of the gearbox.
- Renewing all the seals.
The conversion operations consists of:
- Disassembling of the gearbox with the complete gearwheel on location.
- The visual controlling of the delivered gearbox.
- Conserving the inside and the outside of the gearbox.
The conversion operations consists of:
- Disassembling, cleaning and an inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling and an inspection of two friction shafts.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and an inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
The conversion operations consists of:
- Disassembling of the gearbox.
- Performing of the repair constructions.
- Controlling of cone with propellor.
Location, day 1
- Breaking of the output coupling and cable drums.
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
The conversion operations consists of:
- Inspection of two gearboxes on board.
- Controlling and recording of the alignment of the input and output shaft.
- A visual inspection and friction of the inside gearbox.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and a visual inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Re-assembling of the gearbox.
The conversion operations consists of:
- Inspection of two gearboxes on board.
- Controlling and recording of the alignment of the input and output shaft.
- A visual inspection and friction of the inside gearbox.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembly of the bogie and the gearboxes.
- Cleaning of the parts.
- Inspection of the parts.
- Measuring of the flank backlash on the gears of the gearboxes.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the coupling.
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER KBH 400/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER KBH 400/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
Gearbox casing:
- A visual inspection of the gearbox casing for bursts.
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
CONRAD STORK 2-RT-800S/3
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
Gearbox casing:
- A visual inspection of the gearbox casing for bursts.
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
CONRAD STORK Ra-450-3S
The follow instructions were produced at the gearbox:
Disassemling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:.
Gearbox casing (on board):
- A visual controlling of the gearbox for bursts, where possible.
- A visual controlling of the inside and the outside of the preservation.
- A visual controlling of the inside and the outside of the preservation.
CONRAD STORK RB-450H/3
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
KONE THV-350
KUMERA LD 4500-25-R-E1
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
FLENDER SVN 400
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
KONE THV-328H
- Preparing a test run in our working place for two hours.
- Disassembling of the gearbox.
- Renewing all the seals.
KUMERA LD 4500-25-R-E1
- The visual controlling of the delivered gearbox.
- Conserving the inside and the outside of the gearbox.
WGW KSHK 1330 S/So
- Performing of the repair constructions.
- Renewing of the seals and bearings.
PIV LC180-12H
- Deploying of the inspection report.
- Stop point.
HANSEN OR1001447-QVRB2L-CUN
- Performing of the repair constructions.
- Deploying of the inspection report.
KUYPERS 572845
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
PHB KSZg 355 Pu
- Performing of the repair constructions.
- Controlling of cone with propellor.
LIPS FT09-HB
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
FLENDER KBH 400/S/So
- Controlling and recording of the alignment of the input and output shaft.
- A visual inspection and friction of the inside gearbox.
CONRAD STORK RB-450H/3
- Deploying of the inspection report.
- Stop point.
PHILADELPHIA 3420-CT
- Performing of the repair constructions.
- Deploying of the inspection report.
- Re-assembling of the gearbox.
SANTASALO YE4-0680HW100-313VTS
- Controlling and recording of the alignment of the input and output shaft.
- A visual inspection and friction of the inside gearbox.
CONRAD STORK 3R-320/Spec
- Deploying of the inspection report.
- Stop point.
REXNORD SPRN84C18U-G-280-L-5
Revisionconstruction and supply comprehensive:
- Disassembling of the fourteen gearboxes.
- Inspection of all parts of the gearboxes:
- Disassembling of the fourteen gearboxes.
- Inspection of all parts of the gearboxes:
PHB 3-SZ-500-So
- Cleaning of the parts.
- Inspection of the parts.
- Measuring of the flank backlash on the gears of the gearboxes.
SANTASALO 3-TKC-180-NE
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of the coupling.
PHB 3-SG-710 II