Global Activities
Our activities in the Netherlands
Our headquarters are located in The Netherlands and we serve a lot of clients in our own country. On this page a selection of gearbox projects done in The Netherlands are included. More information about the project can be viewed by clicking on the links listed below.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Controlling the gearings for bursts by means of magnafluxing.
The conversion operations consists of:
- Disassembling, cleaning and a visual inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of all seals and bearings.
- Renewing of the output shaft.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Interchanging of the gearbox.
- Performing of the repair constructions.
- Construction of the Malmedie coupling.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Inspection of the disassembled bow thruster gearbox.
- Deploying of the inspection report.
- Stop point.
Gearbox casing
- Inside box was in poor condition, we had to scrape, to polish,
to degrease and to conserve in the excisting colour.
- Outside box was in poor condition.
Gearbox casing
- The inside conservation was in poor condition. We had to scrape,
to degrease and to conserve in the excisting colour.
The follow instructions were produced at the gearbox:
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling of the gearbox.
- Modifying of the gearbox.
- Performing of the repair constructions.
- Assembling of the input coupling and output cable drum.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Renewing og all seals, bearings and innerrings.
- Renewing of diverse small items such as gaskets and bolts.
The conversion operations consists of:
- Performing of an inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling of the gearbox on location.
- Transporting of the gearbox to our workingshop.
- Performing of the repair constructions.
The conversion operations consists of:
- A visual inspection of the gearbox.
- Performing of the repair constructions.
- Vibration measurement, probably damages at the bearings of the output shaft.
- Performing of the repair constructions.
- Controlling the gearings for bursts by means of magnafluxing.
FLENDER PEAC 4280,6
- Performing of the repair constructions.
- Renewing of all seals and bearings.
- Renewing of the output shaft.
ZPMC TB220.13.D1B-00
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
ZPMC FH1230.24.A1B-00
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
FLENDER KBH 400/S/So
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
PHB KSZg 355 Pu
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
FLENDER KBH 400/S/So
- Performing of the repair constructions.
- Construction of the Malmedie coupling.
DEMAG 200 ZW/KR
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
FLENDER Sonder 195
- Deploying of the inspection report.
- Stop point.
LIPS FT09
to degrease and to conserve in the excisting colour.
- Outside box was in poor condition.
WGW SC 1,5/SO
to degrease and to conserve in the excisting colour.
WGW SC 1,5/SO
- Renewing of all seals and bearings.
- Renewing of various consumables such as gaskets and mounting hardware.
- Re-assembling of the gearbox.
FLENDER KADS 160-K
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
M.A.N. 08-208
- Modifying of the gearbox.
- Performing of the repair constructions.
- Assembling of the input coupling and output cable drum.
PIV PD31-R10-H14
Our client had a problem with the gearbox RENK SHSI 3S 1000.
We performed:
- Disassembling and inspection.
- We assembled the complete gearbox again and performed a test run.
We performed:
- Disassembling and inspection.
- We assembled the complete gearbox again and performed a test run.
RENK SHSI-3S-1000
This report provides the findings of the exported visual inspection to the gearbox.
The purpose of the inspection is to determine the condition of the gearbox.
REINTJES WAF 5555
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
PIV PLC18-R11-G11
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
WGW KSHK 1330 S/So
- Performing of the repair constructions.
- Renewing og all seals, bearings and innerrings.
- Renewing of diverse small items such as gaskets and bolts.
KUMERA TNC34002BX504-125
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
CONRAD STORK 2x 2R630
- Performing of the repair constructions.
- Deploying of the inspection report.
FLENDER ZF148K-IEC250
- Transporting of the gearbox to our workingshop.
- Performing of the repair constructions.
FLENDER ZF148K-IEC250
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
HANSEN PHF23-BRN-12,5
The follow instructions were produced at the gearbox:
Disassembling, cleaning and inspection of the gearbox.
Inspection of the parts consisting of the following instruction:
PIV LB180-12H
- Performing of the repair constructions.
- Vibration measurement, probably damages at the bearings of the output shaft.
WGW AA-SCZ-600-2-S