GBS Gearbox Services international brand of Schaaf- en Boorwerk Rotterdam B.V.
Emergency Hotline

Global Activities

Our activities Europe

Update 22-08-2011
Here below are shown some of the countries in which we have worked:
Projects last 6 months
Projects more then 6 months
Projects in progress NOW
The list below shows a selection of the projects we have done, except projects in The Netherlands and Belgium, sorted by country:

Pagina:
Previous 1 ... 5 6 7 8 9 ... 12 Next

The follow instructions were produced at the gearbox:
  • Disassembling and cleaning of the gearbox.
  • Inspection of the parts consisting of the following instruction:
  • KONE THV-328H
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - A visual inspection, a test run and the complete installing of the gear on location.
        - Preparing a test run in our working place for two hours.
        - Disassembling of the gearbox.
        - Renewing all the seals.
    KUMERA LD 4500-25-R-E1
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling of the gearbox with the complete gearwheel on location.
        - The visual controlling of the delivered gearbox.
        - Conserving the inside and the outside of the gearbox.
    WGW KSHK 1330 S/So
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and an inspection of the gearbox.
        - Performing of the repair constructions.
        - Renewing of the seals and bearings.
    PIV LC180-12H
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    HANSEN OR1001447-QVRB2L-CUN
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling and an inspection of two friction shafts.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
    KUYPERS 572845
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and an inspection of the gearbox.
        - Performing of the repair constructions.
        - Renewing of the seals and bearings.
        - Re-assembling of the gearbox.
    PHB KSZg 355 Pu
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  • - Disassembling of the gearbox.
    - Performing of the repair constructions.
    - Controlling of cone with propellor.
    LIPS FT09-HB
    The Netherlands
    The Netherlands
    October 2013
  • Location, day 1
  •     - Breaking of the output coupling and cable drums.
        - Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
        - Lifting up the output shaft on location and transporting to our working place.
        - Breaking of the input coupling and moving of the E-motor.
    FLENDER KBH 400/S/So
    The Netherlands
    The Netherlands
    October 2013
  • The conversion operations consists of:
  • - Inspection of two gearboxes on board.
    - Controlling and recording of the alignment of the input and output shaft.
    - A visual inspection and friction of the inside gearbox.
    CONRAD STORK RB-450H/3
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    PHILADELPHIA 3420-CT
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and a visual inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Re-assembling of the gearbox.
    SANTASALO YE4-0680HW100-313VTS
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  • - Inspection of two gearboxes on board.
    - Controlling and recording of the alignment of the input and output shaft.
    - A visual inspection and friction of the inside gearbox.
    CONRAD STORK 3R-320/Spec
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    REXNORD SPRN84C18U-G-280-L-5
    The Netherlands
    The Netherlands
    September 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling of the fourteen gearboxes.
       - Inspection of all parts of the gearboxes:
    PHB 3-SZ-500-So
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  • - Disassembly of the bogie and the gearboxes.
    - Cleaning of the parts.
    - Inspection of the parts.
    - Measuring of the flank backlash on the gears of the gearboxes.
    SANTASALO 3-TKC-180-NE
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Renewing of the coupling.
    PHB 3-SG-710 II
    The Netherlands
    The Netherlands
    September 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    PHB K3SVZg-500
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Renewing of the coupling.
    SANTASALO 3TKC180NE
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Renewing of the coupling.
    SANTASALO 3TKC180NE
    The Netherlands
    The Netherlands
    September 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    PHB 3-SZ-500-So
    The Netherlands
    The Netherlands
    September 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    PHB 3-SZ-500-So
    The Netherlands
    The Netherlands
    September 2013
       Revisionconstruction and supply comprehensive:
       - Disassembling and cleaning of the gearbox.
       - Inspection of all parts of the gearbox:
    PHB 3-SZ-500-So
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Stop point.
    ZPMC TB220.13.D1B-00
    The Netherlands
    The Netherlands
    September 2013
  • The conversion operations consists of:
  •     - Disassembling, cleaning and inspection of the gearbox.
        - Performing of the repair constructions.
        - Deploying of the inspection report.
        - Stop point.
    ZPMC TB220.13.D1B-00
    The Netherlands
    The Netherlands
    September 2013

    Pagina:
    Previous 1 ... 5 6 7 8 9 ... 12 Next