Global Activities
Our activities Europe
Update 22-08-2011
Here below are shown some of the countries in which we have worked:
Projects last 6 months
Projects more then 6 months
Projects in progress NOW
The list below shows a selection of the projects we have done, except projects in The Netherlands and Belgium, sorted by country:
Disassembly on board
- All piping and electric connections were removed.
- Hydraulic pump for the rudder control was removed.
- The input shaft coupling was disconnected from the main engine.
The conversion operations consists of:
- Performing of a visual inspection of the propulsion gearbox onboard.
- Performing of a videoscopic inspection to check the gears and the bearings.
- Deploying of the inspection report.
The conversion operations consists of:
- A visual inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
We performed an inspection and repair on a gearbox LOHMANN & STOLTERFOHT GCS850.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of all seals, bearings and innerrings.
- Hydraulic pump for the rudder control was removed.
- The input shaft coupling was disconnected from the main engine.
RHENANIA AWNG 45/50S
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
VALMET K-80F
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Gearbox casing: - A visual inspection of the gearbox casing for bursts.
RENK ZSK 83/90-M240
Performing an inspection of two gearboxes of Kuypers onsite.
Inspected for any tears in the gearboxes.
- Founding: water was filled in the oil tank.
- We repaired the damage onsite.
Inspected for any tears in the gearboxes.
- Founding: water was filled in the oil tank.
- We repaired the damage onsite.
KUYPERS 54080
Inspection (also infrared) and overhaul of gearbox of brand Lohmann & Stolterfoht.
LOHMANN & STOLTERFOHT GUS 450B
Engineering and delivery of different parts, assembly, test run and painting exterior in existing color.
LOHMANN & STOLTERFOHT GFB 35T2 1000
Inspection and repair on FLENDER G1-750VY gearbox
Scope of work:
- Inspection propulsion gearbox, Flender GA 845.
During inspection not, all bearings and gears could be inspected.
Small leakages were observed around the gearbox at the seals and on the OD-box.
The generator shaft bearings show wear, scratches and small indentations. The conditions of these bearings can be considered as non-acceptable.
Small steel particles were observed in the filter elements.
During the last oil sample there was found water inside the oil of the gearbox. Water in the oil can reduce the lifetime of the bearings and the gears.
Scope of work:
- Inspection propulsion gearbox, Flender GA 845.
During inspection not, all bearings and gears could be inspected.
Small leakages were observed around the gearbox at the seals and on the OD-box.
The generator shaft bearings show wear, scratches and small indentations. The conditions of these bearings can be considered as non-acceptable.
Small steel particles were observed in the filter elements.
During the last oil sample there was found water inside the oil of the gearbox. Water in the oil can reduce the lifetime of the bearings and the gears.
FLENDER G1-750VY
- Performing of a videoscopic inspection to check the gears and the bearings.
- Deploying of the inspection report.
VALMET MH1BC-915+P500
Inspection performed on the propulsion gearboxes of the NST xxxx. The Chief Engineer observed high temperatures near the input shaft bearing (motor side) of the starboard side gearbox.
CHONGQING GWS4245
Full inspection of damaged gearbox and coarse analyses. Full repair of this gearbox including Voith couplings.
LOHMANN & STOLTERFOHT 2 ES 112,5
Inspection and repair on RENK HSU-1120 gearbox
RENK HSU-1120
- Repairing the gears of Lohmann Stolterfoht gearbox.
- Inspection with our videoscope on site.
- Repairing the leakage.
- Inspection with our videoscope on site.
- Repairing the leakage.
LOHMANN & STOLTERFOHT GCH800
Onboard assembly of the KUYPERS gearbox type 561745 (561700 series).
KUYPERS 561745
Performing on gearbox HANGZHOU ADVANCE GWC 52.59-01
disassembling and cleaning of the parts. In our inspection we found
the piston ring and buses should be renewed. We renewed
these parts and assembled the gearbox again.
disassembling and cleaning of the parts. In our inspection we found
the piston ring and buses should be renewed. We renewed
these parts and assembled the gearbox again.
HANGZHOU ADVANCE GWC 52.59-01
- Performing of the repair constructions.
- Deploying of the inspection report.
BRUSSELLE M.90-1-0
Our client in Lithuania had problems with the gearbox of the ship.
Engineers immediately disassembled and inspected.
After inspection and repair, the parts were send back to Lithuania.
The gearbox was assembled there again.
Engineers immediately disassembled and inspected.
After inspection and repair, the parts were send back to Lithuania.
The gearbox was assembled there again.
REINTJES WAF 561
Inspection and repair on JAHNEL-KESTERMANN WD-A4S1520 gearbox
We performed inspections onboard a vessel. Location, Chennai, India
Performed inspections:
- Dredge pump gearbox (submerged)
- PS inboard dredge pump
- SB inboard dredge pump
- Cutter gearbox
- Side wire winch PS
We performed inspections onboard a vessel. Location, Chennai, India
Performed inspections:
- Dredge pump gearbox (submerged)
- PS inboard dredge pump
- SB inboard dredge pump
- Cutter gearbox
- Side wire winch PS
JAHNEL KESTERMANN WD-A4S1520
Inspection and repair on RENK SHH 11 1135,1/760 gearbox
This client from Norway came to us with this RENK SHH 11 1135,1/760. We inspected the gearbox and performed a repair. After a succesful testrun we shipped the gearbox back to the client.
Upon arrival on the vessel in Rotterdam, preparations were made to disassemble the gearbox. Only upon arrival at anchorage in Scheveningen the disassembly could be started.
The gearbox showed no signs of serious damage or wear, beside normal wear on bearings and impact marks on the gears, from running without load. The intermediate shaft driven-end bearing however was found heavily damaged, most likely caused by slipping of the rollers/bearing.
It is suspected that
This client from Norway came to us with this RENK SHH 11 1135,1/760. We inspected the gearbox and performed a repair. After a succesful testrun we shipped the gearbox back to the client.
Upon arrival on the vessel in Rotterdam, preparations were made to disassemble the gearbox. Only upon arrival at anchorage in Scheveningen the disassembly could be started.
The gearbox showed no signs of serious damage or wear, beside normal wear on bearings and impact marks on the gears, from running without load. The intermediate shaft driven-end bearing however was found heavily damaged, most likely caused by slipping of the rollers/bearing.
It is suspected that
RENK SHH 11 1135,1/760
Inspection and repair on RENK SHH 11 1135,1/760 gearbox
GBS was invited to perform the below mentioned activities on board a vessel:
- Taking out the intermediate shaft with od box and input gearwheel
- Disassembly of vulkan elements with the intermediate shaft out of the input gearwheel
- Overhaul of the generator gearbox
For the testrun is agreed that the crew of the ship will carry out.
The testrun will be for four hours, the test run was explained to the super intended and the cheef mechanic.
GBS was invited to perform the below mentioned activities on board a vessel:
- Taking out the intermediate shaft with od box and input gearwheel
- Disassembly of vulkan elements with the intermediate shaft out of the input gearwheel
- Overhaul of the generator gearbox
For the testrun is agreed that the crew of the ship will carry out.
The testrun will be for four hours, the test run was explained to the super intended and the cheef mechanic.
RENK SHH 11 1135,1/760
We performed an inspection and repair on a gearbox LOHMANN & STOLTERFOHT GCS850.
LOHMANN & STOLTERFOHT GCS850
- Performing of the repair constructions.
- Deploying of the inspection report.
HANSEN RLC-23-S
- Performing of the repair constructions.
- Deploying of the inspection report.
- Renewing of all seals, bearings and innerrings.
LOHMANN & STOLTERFOHT GVL 375 A
On gearbox Hansen II-A33K-28-ANBR we performed an inspection.
We renewed all bearings, seals and performed a test run onsite.
We renewed all bearings, seals and performed a test run onsite.
HANSEN II-A33K-28-ANBR
Inspection and repair on ZOLLERN ZHP 4.25 gearbox
This page provides an overview of the inspection a ZOLLERN planetary winch gearbox.
The gearbox was sent to the GBS International workshop to carry out the inspection. All findings are listed here.
The working parts of the gearbox are in good condition, gears and shafts can be re-used, as well as the planetary gear bearings. Other bearings should be replaced.
This page provides an overview of the inspection a ZOLLERN planetary winch gearbox.
The gearbox was sent to the GBS International workshop to carry out the inspection. All findings are listed here.
The working parts of the gearbox are in good condition, gears and shafts can be re-used, as well as the planetary gear bearings. Other bearings should be replaced.
ZOLLERN ZHP 4.25