Global Activities
Our activities Europe
Update 22-08-2011
Here below are shown some of the countries in which we have worked:
Projects last 6 months
Projects more then 6 months
Projects in progress NOW
The list below shows a selection of the projects we have done, except projects in The Netherlands and Belgium, sorted by country:
The follow instructions were produced at the gearbox:
The follow instructions were produced at the gearbox:
The follow instructions were produced at the gearbox:
The conversion operations consists of:
- A visual inspection of the gearbox with the aid of a videoscope through the inspection cover.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling of the gearbox.
- Equalizing of the spur bevel gear.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling of the PTO shaft out of the gearbox.
- Transporting the gearbox to our workshop.
- Renewing of the bearings.
The conversion operations consists of:
- Disassembling of the gearbox.
- Inspection and revision of the gearbox.
- Renewing of the complete inside box.
The conversion operations consists of:
- Disassembling of the gearbox.
- Inspection and revision of the gearbox.
- Renewing of the complete inside box.
The conversion operations consists of:
- Revision on the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Disassembling, cleaning, visual inspection and assembling. Test run with report.
- Renewing of various consumables such as gaskets and mounting hardware.
- Re-assembling of the gearbox.
ZPMC FB515.916.D1A-00
- Disassembling, cleaning, visual inspection and assembling. Test run with report.
- Renewing of all seals and bearings.
- Renewing of various consumables such as gaskets and mounting hardware.
ZPMC FB515.916.D1A-00
This presents the findings of the visual inspection, vibration analysis and shaft
alignment check, performed on the generator gearbox of Asug. For the
inspection of the gears and bearings of the gearbox, a videoscope was used.
Clear images can be viewed and recorded by a videoscope at locations with
limited accessibility.
alignment check, performed on the generator gearbox of Asug. For the
inspection of the gears and bearings of the gearbox, a videoscope was used.
Clear images can be viewed and recorded by a videoscope at locations with
limited accessibility.
ASUG STG-2-900
- Disassembling, cleaning, visual inspection and assembling. Test run with report.
- Renewing of various consumables such as gaskets and mounting hardware.
- Renewing of spur bevel gear set.
- Renewing of the pinion shaft.
FLENDER KBH 400/S/So
- Performing of the repair constructions.
- Deploying of the inspection report.
FLENDER H2-SV-7B
- Performing of the repair constructions.
- Deploying of the inspection report.
FLENDER FZAZ148 G180M4 L400
- Deploying of the inspection report.
- Stop point.
HANSEN 536
- Equalizing of the spur bevel gear.
- Performing of the repair constructions.
GSM UNKNOWN
- Transporting the gearbox to our workshop.
- Renewing of the bearings.
REINTJES WAF-5555
- Inspection and revision of the gearbox.
- Renewing of the complete inside box.
RADEMAKERS CSCF-100
- Inspection and revision of the gearbox.
- Renewing of the complete inside box.
RADEMAKERS CSCF-100
- Performing of the repair constructions.
- Deploying of the inspection report.
MARLEY UNKNOWN
- Performing of the repair constructions.
- Deploying of the inspection report.
REGGIANA PLANETARY GEARB WGF
We performed an inspection and revision on gearbox HYOSUNG 440-KIPS-SPH80.
The conversion operations consists of:
- Disassembling of the forwardbox.
- Performing of the repair constructions.
- Disassembling and cleaning of the planetary gearbox.
- Renewing of the output shaft bearing.
- Performing of the repair constructions.
- Disassembling and cleaning of the planetary gearbox.
- Renewing of the output shaft bearing.
HYOSUNG 440-KIPS-SPH80
- Performing of the repair constructions.
- Deploying of the inspection report.
REINTJES WAF-5555
Our work:
We first disassembled gearbox Lohmann & Stolterfoht onsite.
It was necessary to make a visual inspection, so we transported it to our workshop.
We performed a visual inspection with our endoscope.
All our findings were reported in an inspection report for our client.
We first disassembled gearbox Lohmann & Stolterfoht onsite.
It was necessary to make a visual inspection, so we transported it to our workshop.
We performed a visual inspection with our endoscope.
All our findings were reported in an inspection report for our client.
LOHMANN & STOLTERFOHT PLANETAIRE
Disassembly, cleaning and inspection of gearbox. Preparing an inspection report and preform overhaul of gearbox.
MARLEY 22.2
- Disassembling, cleaning and inspection on gearbox SCHARPEGGE-394470.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
SCHARPEGGE 3944700
- Removing, cleaning and inspecting the gearbox.
- Repair of the gearbox and testrun.
- Repair of the gearbox and testrun.
BHS TG 28
- Full inspection of damaged gearbox.
- Complete repair of this gearbox including test run.
- Complete repair of this gearbox including test run.
BIERENS 26 Spec
- Disassembling, cleaning and inspection on gearbox ZAE-90.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
ZAE 90-1049-1-M
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
RHENANIA 99436760
- Disassembling, cleaning and inspection on gearbox RHENANIA-NPS-80-SG.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
RHENANIA Nps 80 Sg
- Disassembling, cleaning and inspection on gearbox RHENANIA-ALN-ps36.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
RHENANIA ALN ps36
-Disassembling, cleaning and inspection on gearbox RHENANIA-ALNps-60-Sond-360.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
- Reporting and making a revision proposal.
- Assembling and revision according to revision proposal.
- Performing a test run with a test run report.
RHENANIA ALNps 60 Sond 360