Global Activities
Our activities Europe
We provided gearbox services all over the world. As our headquarters are located in The Netherlands in Europe, we do a lot of gearbox related project in this region. Listed below are a selection of projects we have done in the past. By clicking on one of the links, you can read more details and view pictures of our work.
Projects last 6 months
Projects more then 6 months
Projects in progress NOW
Update 22-5-2014
The list below shows a selection of the projects we have done, except projects in The Netherlands and Belgium, sorted by country:
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Inspection of the Motor-reductor.
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and an inspection of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling of the gearbox.
- Performing of the repair constructions.
- Bearingdamages on the gearwheel.
Inside of the box:
- Controlling of the condition of the serrations of all gearings.
- Controlling of the bearings for damages.
- Controlling for the flatness of the contact patterns and the flank backlashes of all gearings.
- Controlling of the shaftsizes in way of the bearings, oilseals and couplings for dimensions and damages.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Making of a complete new casing.
- Assembling and a test run of the gearbox.
The conversion operations consists of:
- Disassembling and cleaning of the complete gearbox.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling and cleaning of the complete gearbox.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling and cleaning of the complete gearbox.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
Disassembling, cleaning and a inspection of the gearbox.
Controlling the inside for bursts.
Replacing of seals and bearings.
Renewing of the pinion shaft.
Location, day 1
- Breaking of the output coupling and cable drums.
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
- Performing of the repair constructions.
- Deploying of the inspection report.
HANSEN RLD-33-S-BRH-20
- Deploying of the inspection report.
- Stop point.
EKATO EKF-3V-280-660-KR
This report provides an overview of the findings, obtained during the repair, testing
and installation of the main trolley gearbox.
- All bearings have been renewed.
- All seals have been renewed.
- The gearbox is cleaned internally and externally.
and installation of the main trolley gearbox.
- All bearings have been renewed.
- All seals have been renewed.
- The gearbox is cleaned internally and externally.
ZPMC FH1610.28.C3B-00
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
HYDRO 123
- Performing of the repair constructions.
- Renewing of the seals and bearings.
PIV PD31-R10-H14
- Performing of the repair constructions.
- Bearingdamages on the gearwheel.
SANTASALO 3TKC180NE
- Controlling of the bearings for damages.
- Controlling for the flatness of the contact patterns and the flank backlashes of all gearings.
- Controlling of the shaftsizes in way of the bearings, oilseals and couplings for dimensions and damages.
FLENDER KDA 320
- Making of a complete new casing.
- Assembling and a test run of the gearbox.
BHS TG-28
- Performing of the repair constructions.
FLENDER KDA 320
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
WGW KSHK 1330 S/So
This report provides the findings of the exported visual inspection
and the vibratiuon measurement to the gearbox.
The purpose of the inspection is to determine the condition of the gearbox.
At the inspection of the gearbox is used a videoscope.
and the vibratiuon measurement to the gearbox.
The purpose of the inspection is to determine the condition of the gearbox.
At the inspection of the gearbox is used a videoscope.
ZPMC FH1060.2.24.A2A
- Performing of the repair constructions.
CONRAD STORK 3R 560 S/3
- Performing of the repair constructions.
CONRAD STORK 3R 560 S/3
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
Gearbox casing:
- A visual inspection of the gearbox casing for bursts.
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER ZF148K-IEC250
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox on location.
- Inspection of all parts of the gearbox:
Gearbox casing:
- A visual inspection of the gearbox casing for bursts.
- Disassembling and cleaning of the gearbox on location.
- Inspection of all parts of the gearbox:
FLENDER ZF68-K2-(100)
- Deploying of the inspection report.
- Stop point.
FLENDER FZAF108B
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER KBH 400/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER KBH 400/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
FLENDER KBH 400/S/So
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
Gearbox casing:
- A visual inspection of the gearbox casing for bursts.
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
CONRAD STORK 2-RT-800S/3
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
Gearbox casing:
- A visual inspection of the gearbox casing for bursts.
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
CONRAD STORK Ra-450-3S
The follow instructions were produced at the gearbox:
Disassemling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:.
Gearbox casing (on board):
- A visual controlling of the gearbox for bursts, where possible.
- A visual controlling of the inside and the outside of the preservation.
- A visual controlling of the inside and the outside of the preservation.
CONRAD STORK RB-450H/3
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
KONE THV-350
KUMERA LD 4500-25-R-E1
- Moving of the cable drums on lacation, so we can disassemble the output shaft from the gearbox.
- Lifting up the output shaft on location and transporting to our working place.
- Breaking of the input coupling and moving of the E-motor.
FLENDER SVN 400