Global Activities
Our activities Europe
We provided gearbox services all over the world. As our headquarters are located in The Netherlands in Europe, we do a lot of gearbox related project in this region. Listed below are a selection of projects we have done in the past. By clicking on one of the links, you can read more details and view pictures of our work.
Projects last 6 months
Projects more then 6 months
Projects in progress NOW
Update 22-5-2014
The list below shows a selection of the projects we have done, except projects in The Netherlands and Belgium, sorted by country:
The conversion operations consists of:
- Inspection of the disassembled bow thruster gearbox.
- Deploying of the inspection report.
- Stop point.
Gearbox casing
- Inside box was in poor condition, we had to scrape, to polish,
to degrease and to conserve in the excisting colour.
- Outside box was in poor condition.
Gearbox casing
- The inside conservation was in poor condition. We had to scrape,
to degrease and to conserve in the excisting colour.
The follow instructions were produced at the gearbox:
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling of the gearbox.
- Modifying of the gearbox.
- Performing of the repair constructions.
- Assembling of the input coupling and output cable drum.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Renewing og all seals, bearings and innerrings.
- Renewing of diverse small items such as gaskets and bolts.
The conversion operations consists of:
- Performing of an inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling of the gearbox on location.
- Transporting of the gearbox to our workingshop.
- Performing of the repair constructions.
The conversion operations consists of:
- A visual inspection of the gearbox.
- Performing of the repair constructions.
- Vibration measurement, probably damages at the bearings of the output shaft.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Controlling of the toothing for bursts with the aid of magnafluxing.
- Controlling of the tempered parts for bursts with the aid of magnafluxing.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling of the inside of the gearbox, the bearings not yet.
- Renewing of all seals and bearings.
- Disassembling and inspection of the input and the output coupling.
- Deploying of the inspection report.
- Stop point.
LIPS FT09
to degrease and to conserve in the excisting colour.
- Outside box was in poor condition.
WGW SC 1,5/SO
to degrease and to conserve in the excisting colour.
WGW SC 1,5/SO
- Renewing of all seals and bearings.
- Renewing of various consumables such as gaskets and mounting hardware.
- Re-assembling of the gearbox.
FLENDER KADS 160-K
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
M.A.N. 08-208
- Modifying of the gearbox.
- Performing of the repair constructions.
- Assembling of the input coupling and output cable drum.
PIV PD31-R10-H14
Our client had a problem with the gearbox RENK SHSI 3S 1000.
We performed:
- Disassembling and inspection.
- We assembled the complete gearbox again and performed a test run.
We performed:
- Disassembling and inspection.
- We assembled the complete gearbox again and performed a test run.
RENK SHSI-3S-1000
This report provides the findings of the exported visual inspection to the gearbox.
The purpose of the inspection is to determine the condition of the gearbox.
REINTJES WAF 5555
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
PIV PLC18-R11-G11
- Performing of the repair constructions.
- Renewing of the seals and bearings.
- Re-assembling of the gearbox.
WGW KSHK 1330 S/So
- Performing of the repair constructions.
- Renewing og all seals, bearings and innerrings.
- Renewing of diverse small items such as gaskets and bolts.
KUMERA TNC34002BX504-125
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
CONRAD STORK 2x 2R630
- Performing of the repair constructions.
- Deploying of the inspection report.
FLENDER ZF148K-IEC250
- Transporting of the gearbox to our workingshop.
- Performing of the repair constructions.
FLENDER ZF148K-IEC250
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
HANSEN PHF23-BRN-12,5
The follow instructions were produced at the gearbox:
Disassembling, cleaning and inspection of the gearbox.
Inspection of the parts consisting of the following instruction:
PIV LB180-12H
- Performing of the repair constructions.
- Vibration measurement, probably damages at the bearings of the output shaft.
WGW AA-SCZ-600-2-S
- Performing of the repair constructions.
- Renewing of the seals and bearings.
WGW KS 5,75/S/So
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:.
PIV PD31-R10-H14
- Performing of the repair constructions.
- Deploying of the inspection report.
- Stop point.
MIELE FAKR1-155-S
The follow instructions were produced at the gearbox:
Disassembling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:
MIELE FAKR1-155-S
- Performing of the repair constructions.
- Renewing of the seals and bearings.
HANSEN PDC23S-BNN-14,5
- Controlling of the toothing for bursts with the aid of magnafluxing.
- Controlling of the tempered parts for bursts with the aid of magnafluxing.
RADEMAKERS Raplan 275L
- Performing of the repair constructions.
- Renewing of the seals and bearings.
SIEMENS B2-DH-14C
- Renewing of all seals and bearings.
- Disassembling and inspection of the input and the output coupling.
DEMAG 200 ZW/KR