We provided gearbox services all over the world. As our headquarters are located in The Netherlands in Europe, we do a lot of gearbox related project in this region. Listed below are a selection of projects we have done in the past. By clicking on one of the links, you can read more details and view pictures of our work.
Projects last 6 months
Projects more then 6 months
Projects in progress NOW
Update 22-5-2014
The list below shows a selection of the projects we have done, except projects in The Netherlands and Belgium, sorted by country:
The conversion operations consists of:
- Verification of mechanical run-out values.
- Recording and analyzing of relative shaft vibrations.
- Installatioin of trim balance weights on the steam turbine coupling hub.
The conversion operations consists of:
- Disassembling and ispection of the gearbox on location.
- Renewing of the axial-radial bearings of the input hollow shaft.
- Refacing bearing surfaces of the hollow shaft.
The conversion operations consists of:
- Performing a visual inspection.
- Controlling the first intermediate shaft for micro pitting.
- Performing of a videoscopic inspection.
- Bringing back of the oil level under the maximum allowed.
Gearbox casing
- Outside box was in poor condition, we had to scrape, to polish,
to degrease and to conserve in the excisting colour.
- Inside box was in poor condition.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Controlling of the serration for bursts with the aid of magnafluxing.
- Controlling of the shafts for bursts.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Performing of a visual inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Replacing of the complete gearbox.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
- Recording and analyzing of relative shaft vibrations.
- Installatioin of trim balance weights on the steam turbine coupling hub.
LUFKIN 2DYRPE8-IIIB-III
This gearbox of WINERGY PEAB 4435 had several damaged.
We performed an inspection and overhauled/replaced the gearbox.
We performed an inspection and overhauled/replaced the gearbox.
WINERGY PEAB 4435
Inspection and overhaul of gearbox of brand Lohmann & Stolterfoht in Tymien, Poland.
LOHMANN & STOLTERFOHT GPV 441
Inspection and repair on JAHNEL-KESTERMANN CSBV 225 L gearbox
JAHNEL KESTERMANN CSBV 225 L
Inspection on the clearance.
Assembling the gearbox.
Checking if the gearbox is in a good condition.
Assembling the gearbox.
Checking if the gearbox is in a good condition.
EISENBEISS ZSE-130
For our client in Scotland we performed a visual inspection
on gearbox Rexroth GPV 306. Our engineers also
performed a vibration measurement on a wind turbine.
on gearbox Rexroth GPV 306. Our engineers also
performed a vibration measurement on a wind turbine.
REXROTH GPV 306
Visual inspection with videoscope on gearbox FLENDER CS0280/710.
FLENDER CS0280/710
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
- Gearbox casing: - A visual inspection of the gearbox casing for bursts.
FLENDER CS0-710
- Renewing of the axial-radial bearings of the input hollow shaft.
- Refacing bearing surfaces of the hollow shaft.
RENK TACKE HSU-800D
- Controlling the first intermediate shaft for micro pitting.
- Performing of a videoscopic inspection.
- Bringing back of the oil level under the maximum allowed.
LOHMANN & STOLTERFOHT GUS450
Troubleshooting on gearbox Flender bh 35 515 on site.
Our client had problems with switching.
The bearings were slightly damaged.
We repaired them immediately.
Our client had problems with switching.
The bearings were slightly damaged.
We repaired them immediately.
FLENDER bh35 515
We performed on gearbox Lohmann & Stolterfoht:
- Disassembled in order to check all bearings and gears.
- Control measurements of all bearings and gears.
- Removed the old and fitted the new drive gear wheel for the direct driven gear oil pump and cpp pump.
- Investigated the reason for the beak down of the first driven pumps.
- Fitted the new direct driven pumps.
- Disassembled in order to check all bearings and gears.
- Control measurements of all bearings and gears.
- Removed the old and fitted the new drive gear wheel for the direct driven gear oil pump and cpp pump.
- Investigated the reason for the beak down of the first driven pumps.
- Fitted the new direct driven pumps.
LOHMANN & STOLTERFOHT GUC 630/1342
Visual inspection on the bearing of the starboard side thruster in Barcelona. Preparing first approach for modification.
ROLLS ROYCE Thruster
Inspection performed on the propulsion gearboxes of the NST xxxx. The Chief Engineer observed high temperatures near the input shaft bearing (motor side) of the starboard side gearbox.
LOHMANN & STOLTERFOHT GWS 4245
to degrease and to conserve in the excisting colour.
- Inside box was in poor condition.
HANSEN RNG24-S
- Inspected gearbox Flender B4-HV-12D.
- Disassembling and cleaning.
- We made a complete inspection report for our client in Sweden.
- Disassembling and cleaning.
- We made a complete inspection report for our client in Sweden.
FLENDER B4-HV-12D
- Inspected gearbox Flender B4-HV-12D in Sweden.
- Broaching the cupboard housing.
- Assembling the gearbox and send it to our client.
- Broaching the cupboard housing.
- Assembling the gearbox and send it to our client.
FLENDER B4-HV-12D
Trouble shooting suspicous vibrations on a steam turbine.
ELLIOTT UNKNOWN
- Controlling of the serration for bursts with the aid of magnafluxing.
- Controlling of the shafts for bursts.
JAHNEL KESTERMANN M-1306-1
- Deploying of the inspection report.
- Stop point.
SIEMENS 355
- Deploying of the inspection report.
- Stop point.
SIEMENS 355
- Deploying of the inspection report.
- Stop point.
ASUG GL-100
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.
FLENDER CG 26-100
- Deploying of the inspection report.
- Replacing of the complete gearbox.
- Stop point.
FLENDER P3NB-9
- Deploying of the inspection report.
- Stop point.
- Performing of the repair constructions.