GBS Gearbox Services international brand of Schaaf- en Boorwerk Rotterdam B.V.
Emergency Hotline
GBS Gearbox Services international

Global Activities

Our activities Europe

We provided gearbox services all over the world. As our headquarters are located in The Netherlands in Europe, we do a lot of gearbox related project in this region. Listed below are a selection of projects we have done in the past. By clicking on one of the links, you can read more details and view pictures of our work.
Projects last 6 months
Projects more then 6 months
Projects in progress NOW
Update 22-5-2014
The list below shows a selection of the projects we have done, except projects in The Netherlands and Belgium, sorted by country:

Pagina:
Previous 1 ... 8 9 10 11 12 Next

  • The follow instructions were produced at the gearbox:
    • Disassembling, cleaning, visual inspection and assembling. Test run with report.
    • Renewing of various consumables such as gaskets and mounting hardware.
    • Re-assembling of the gearbox.
    ZPMC FB515.916.D1A-00
    The Netherlands
    The Netherlands
    April 2013
  • The follow instructions were produced at the gearbox:
    • Disassembling, cleaning, visual inspection and assembling. Test run with report.
    • Renewing of all seals and bearings.
    • Renewing of various consumables such as gaskets and mounting hardware.
    ZPMC FB515.916.D1A-00
    The Netherlands
    The Netherlands
    April 2013
    This presents the findings of the visual inspection, vibration analysis and shaft
    alignment check, performed on the generator gearbox of Asug. For the
    inspection of the gears and bearings of the gearbox, a videoscope was used.
    Clear images can be viewed and recorded by a videoscope at locations with
    limited accessibility.
    ASUG STG-2-900
    The Netherlands
    The Netherlands
    March 2013
  • The follow instructions were produced at the gearbox:
    • Disassembling, cleaning, visual inspection and assembling. Test run with report.
    • Renewing of various consumables such as gaskets and mounting hardware.
    • Renewing of spur bevel gear set.
    • Renewing of the pinion shaft.
    FLENDER KBH 400/S/So
    The Netherlands
    The Netherlands
    March 2013
  • The conversion operations consists of:
  • - A visual inspection of the gearbox with the aid of a videoscope through the inspection cover.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    FLENDER H2-SV-7B
    The Netherlands
    The Netherlands
    March 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    FLENDER FZAZ148 G180M4 L400
    The Netherlands
    The Netherlands
    March 2013
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Deploying of the inspection report.
    - Stop point.
    HANSEN 536
    The Netherlands
    The Netherlands
    January 2013
  • The conversion operations consists of:
  • - Disassembling of the gearbox.
    - Equalizing of the spur bevel gear.
    - Performing of the repair constructions.
    GSM UNKNOWN
    The Netherlands
    The Netherlands
    January 2013
  • The conversion operations consists of:
  • - Disassembling of the PTO shaft out of the gearbox.
    - Transporting the gearbox to our workshop.
    - Renewing of the bearings.
    REINTJES WAF-5555
    The Netherlands
    The Netherlands
    December 2012
  • The conversion operations consists of:
  • - Disassembling of the gearbox.
    - Inspection and revision of the gearbox.
    - Renewing of the complete inside box.
    RADEMAKERS CSCF-100
    The Netherlands
    The Netherlands
    November 2012
  • The conversion operations consists of:
  • - Disassembling of the gearbox.
    - Inspection and revision of the gearbox.
    - Renewing of the complete inside box.
    RADEMAKERS CSCF-100
    The Netherlands
    The Netherlands
    November 2012
  • The conversion operations consists of:
  • - Revision on the gearbox.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    MARLEY UNKNOWN
    The Netherlands
    The Netherlands
    November 2012
  • The conversion operations consists of:
  • - Disassembling, cleaning and inspection of the gearbox.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    REGGIANA PLANETARY GEARB WGF
    The Netherlands
    The Netherlands
    October 2012
    We performed an inspection and revision on gearbox HYOSUNG 440-KIPS-SPH80.

  • The conversion operations consists of:
  • - Disassembling of the forwardbox.
    - Performing of the repair constructions.
    - Disassembling and cleaning of the planetary gearbox.
    - Renewing of the output shaft bearing.
    HYOSUNG 440-KIPS-SPH80
    The Netherlands
    The Netherlands
    October 2012
  • The conversion operations consists of:
  • - Inspection of the gearbox.
    - Performing of the repair constructions.
    - Deploying of the inspection report.
    REINTJES WAF-5555
    The Netherlands
    The Netherlands
    September 2012
    Our work:
    We first disassembled gearbox Lohmann & Stolterfoht onsite.
    It was necessary to make a visual inspection, so we transported it to our workshop.
    We performed a visual inspection with our endoscope.
    All our findings were reported in an inspection report for our client.
    LOHMANN & STOLTERFOHT PLANETAIRE
    The Netherlands
    The Netherlands
    August 2011
    Disassembly, cleaning and inspection of gearbox. Preparing an inspection report and preform overhaul of gearbox.
    MARLEY 22.2
    The Netherlands
    The Netherlands
    June 2011
    - Disassembling, cleaning and inspection on gearbox SCHARPEGGE-394470.
    - Reporting and making a revision proposal.
    - Assembling and revision according to revision proposal.
    - Performing a test run with a test run report.
    SCHARPEGGE 3944700
    The Netherlands
    The Netherlands
    October 2010
    - Removing, cleaning and inspecting the gearbox.
    - Repair of the gearbox and testrun.
    BHS TG 28
    The Netherlands
    The Netherlands
    October 2010
    - Full inspection of damaged gearbox.
    - Complete repair of this gearbox including test run.
    BIERENS 26 Spec
    The Netherlands
    The Netherlands
    September 2010
    - Disassembling, cleaning and inspection on gearbox ZAE-90.
    - Reporting and making a revision proposal.
    - Assembling and revision according to revision proposal.
    ZAE 90-1049-1-M
    The Netherlands
    The Netherlands
    August 2010
    - Reporting and making a revision proposal.
    - Assembling and revision according to revision proposal.
    - Performing a test run with a test run report.
    RHENANIA 99436760
    The Netherlands
    The Netherlands
    July 2010
    - Disassembling, cleaning and inspection on gearbox RHENANIA-NPS-80-SG.
    - Reporting and making a revision proposal.
    - Assembling and revision according to revision proposal.
    - Performing a test run with a test run report.
    RHENANIA Nps 80 Sg
    The Netherlands
    The Netherlands
    July 2010
    - Disassembling, cleaning and inspection on gearbox RHENANIA-ALN-ps36.
    - Reporting and making a revision proposal.
    - Assembling and revision according to revision proposal.
    - Performing a test run with a test run report.
    RHENANIA ALN ps36
    The Netherlands
    The Netherlands
    May 2010
    -Disassembling, cleaning and inspection on gearbox RHENANIA-ALNps-60-Sond-360.
    - Reporting and making a revision proposal.
    - Assembling and revision according to revision proposal.
    - Performing a test run with a test run report.
    RHENANIA ALNps 60 Sond 360
    The Netherlands
    The Netherlands
    May 2010

    Pagina:
    Previous 1 ... 8 9 10 11 12 Next