Our activities in Steel, Cement & Mining Industry
Presentation of our projects in the Steel, Cement & Mining industry
On this page you will find an overview of projects we have done in the Steel, Cement & Mining industry. Our engineers flying all over the world to provide gearbox services in this industry. By clicking on one of the links below, you can view the details of the project including pictures of our work.
Inspection on gearbox Guida Impianti. Our findings were
reported to our client. The damage on this gearbox was repaired.
See our pictures on the left and here below.
reported to our client. The damage on this gearbox was repaired.
See our pictures on the left and here below.
GUIDA IMPIANTI Unknown
Inspection on gearbox Guida Impianti.
Our findings were reported to our client.
The damage on this gearbox was repaired.
Seals and bearings were renewed.
Our findings were reported to our client.
The damage on this gearbox was repaired.
Seals and bearings were renewed.
GUIDA IMPIANTI 2737
Disassembling, cleaning and inspection on gearbox FLENDER Z-101-KM.
Performing an inspection report.
Performing an inspection report.
FLENDER Z-101-KM
Performing:
Disassembling, cleaning and inspection on gearbox FLENDER Z-101-KM.
Making a complete inspection report for our client.
Disassembling, cleaning and inspection on gearbox FLENDER Z-101-KM.
Making a complete inspection report for our client.
FLENDER Z-101-KM
Supply of bearings and seals of gearbox Flender DMGH 25.4 to Kuwait.
FLENDER DMGH 25.4
- Disassembling and cleaning the gearbox.
- Performing an visual inspection with endoscope on gearbox Keller.
- Report our findings and assembling the gearbox again.
- Performing an visual inspection with endoscope on gearbox Keller.
- Report our findings and assembling the gearbox again.
KELLER S2S III H450
Revision of the gearbox and making a complete new gear set.
Revision includes:
Disassembling, cleaning and inspection.
Making an inspection report for our client.
Assembling and adjusting the gearbox.
Revision includes:
Disassembling, cleaning and inspection.
Making an inspection report for our client.
Assembling and adjusting the gearbox.
JAHNEL KESTERMANN G2400 / A565
Inspection on gearbox FLENDER SDN 280 onsite. Performing:
- Inspection alignment.
- Visual inspection with our endoscope.
- Making an inspection report.
- Inspection alignment.
- Visual inspection with our endoscope.
- Making an inspection report.
FLENDER SDN 280
On gearbox SEW MC3RLHF03 we performed an overhaul.
Our work:
Disassembling, assembling and alignment onsite.
Performing a test run.
Our work:
Disassembling, assembling and alignment onsite.
Performing a test run.
SEW MC3RLHF03
Performing:
- Overhaul on gearbox FLENDER P3NB-9.
- Disassembling, assembling and alignment onsite.
- Overhaul on gearbox FLENDER P3NB-9.
- Disassembling, assembling and alignment onsite.
FLENDER P3NB-9
Gearbox was leaking oil.
Proceedings:
Disassembling and cleaning gearbox Nord SK 180 X/4 RIS.
Inspection and reporting to our client.
We repaired the damage and assembled the gearbox.
Proceedings:
Disassembling and cleaning gearbox Nord SK 180 X/4 RIS.
Inspection and reporting to our client.
We repaired the damage and assembled the gearbox.
NORD SK 180 X/4 RIS
Performing of a standard overhaul on gearbox SEW FA-107.
This includes disassembling, cleaning and inspection.
When the gearbox is inspected, we assembled it again and
made a test run.
This includes disassembling, cleaning and inspection.
When the gearbox is inspected, we assembled it again and
made a test run.
SEW FA-107
Performing:
- Disassembling, cleaning and inspection on gearbox FLENDER P3NB-9.
- Making a complete inspection report for our client.
- Disassembling, cleaning and inspection on gearbox FLENDER P3NB-9.
- Making a complete inspection report for our client.
FLENDER P3NB-9
We performed an inspection on gearbox Lohmann & Stolterfoht GMH 12.
We first disassembled and cleaned the gearbox.
After that, we inspected the whole gearbox for any damage or tears.
Our findings were reported to our client.
We first disassembled and cleaned the gearbox.
After that, we inspected the whole gearbox for any damage or tears.
Our findings were reported to our client.
LOHMANN & STOLTERFOHT GMH 12
On gearbox Brevini ED2800/FE we performed an inspection on location.
BREVINI ED2800/FE
Inspection and revision includes:
Disassembling and cleaning of the gearbox. Once we have inspected the gearbox in detail, we make an inspection report for our client.
Disassembling and cleaning of the gearbox. Once we have inspected the gearbox in detail, we make an inspection report for our client.
FLACHGETRIEBE D22
Visual inspection on gearbox Flender with our endoscope onsite, including inspection report.
FLENDER ONBEKEND
- Disassembling, cleaning and inspection on gearbox Brevini ED2800/FE.
- Making an inspection report for our client.
- Making an inspection report for our client.
BREVINI ED2800/FE
Performing vibration measurement and visual inspection on gearbox CMI / DE MALZINE 500 H2.
Visual inspection was performed with an endoscope.
Visual inspection was performed with an endoscope.
CMI / DE MALZINE 500 H2
Performing:
Disassembling onsite.
Transport the gearbox to our workshop for inspection with inspection report.
Disassembling onsite.
Transport the gearbox to our workshop for inspection with inspection report.
FLENDER SPV-135-10J
We performed:
- A visual inspection with our endoscope onsite.
- Analyzing.
- Reporting onsite.
- A visual inspection with our endoscope onsite.
- Analyzing.
- Reporting onsite.
JAHNEL KESTERMANN G2400 / A565
- Disassembling, cleaning and inspection on gearbox Brevini ED2800/FE.
- Making a complete inspection report.
- Making a complete inspection report.
BREVINI ED2800/FE
Performing on location:
Exchange and alignment of gearbox Brevini ED 2800.
Exchange and alignment of gearbox Brevini ED 2800.
BREVINI ED 2800
Performing a visual inspection on gearbox Keller.
The visual inspection was performed with our endoscope.
Making the inspection report for our client.
The visual inspection was performed with our endoscope.
Making the inspection report for our client.
KELLER S 2 S III H500
SEISA DBP 196 V