Our activities in the Energy Industry
Presentation of our Energy Industry projects
On this page we have presented a selection of the projects we have done in the Energy Industry. Our engineers are flying all over the world. If you click on a link listed below, you will be taken to the project page where all details and pictures of the project can be found.
- Disassembly, cleaning and inspection of gearbox.
- Preparing an inspection report and preform overhaul of gearbox.
- Preparing an inspection report and preform overhaul of gearbox.
MARLEY 36
Gearbox Services International was invited to establish the condition of the gearbox, in order to assess which parts can be salvaged, as well as to compile a scope of repair for bringing the gearbox back into service. During the inspection, the gearbox was completely dismantled.
FLENDER GRAFFENSTADEN TX40-4C
Preventive inspection of a Flender Graffenstaden, TX61/1CV, load gearbox. The load gearbox is part of a LM6000 gas turbine driven generator set.
FLENDER GRAFFENSTADEN TX61/1CV
- Full inspection of damaged gearbox.
- Production of new pinion and gear.
- Full repair of this gearbox including test run.
- Production of new pinion and gear.
- Full repair of this gearbox including test run.
G.ELLI C2 225-C
Performing a standard overhaul on gearbox of Rademakers.
Overhauling includes:
Complete disassembling and cleaning all of the gearbox parts.
Inspection/visual inspection with inspection report.
Assembling and test run with test run report.
Overhauling includes:
Complete disassembling and cleaning all of the gearbox parts.
Inspection/visual inspection with inspection report.
Assembling and test run with test run report.
RADEMAKERS RATA A 250
For the replacement of one of the bearings in a production line, our customer had to dismount the gearbox. During this dismounting the output shaft was damaged and it was thought that the output bearings in the gearbox were also damaged.
LOHMANN & STOLTERFOHT GPV 235
Our client had problems with this gearbox, but did know
the exact problem, so we decided to perform an inspection in detail.
the exact problem, so we decided to perform an inspection in detail.
PEKRUN ASR 450 SP
Inspection of three wind turbines in Finland.
We performed:
- Disassembling.
- Cleaning.
- Inspection with inspection report.
We performed:
- Disassembling.
- Cleaning.
- Inspection with inspection report.
HANSEN EH601-J21-BN-98
Performing an inspection, repair, proposal for modification, testrun, checking alignment on spot, and production of a new spare input shaft.
FLENDER NEG MICON 600