
Our activities in the Dredging Industry
Presentation of our Dredging projects
Here you will find a selection of the gearbox related projects we have done in the Dredging market for clients all over the world. If you want more information about a project, you can click the link to view all the details.
We performed an inspection and repair on a gearbox CONRAD STORK 2R910 S/3 Spec.
We performed an inspection and repair on a gearbox CONRAD STORK RB-355BL S/3.
We performed an inspection and repair on a gearbox CONRAD STORK B3DH8B.
We performed an inspection and repair on a gearbox CONRAD STORK 2R910 S/3 Spec.
The conversion operations consists of:
- Inspection of the disassembled bow thruster gearbox.
- Deploying of the inspection report.
- Stop point.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling and cleaning of the gearbox.
- Performing of the repair constructions.
- Renewing of the seals and bearings.
The conversion operations consists of:
- Disassembling, cleaning and inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Disassembling of the gearbox.
- Performing of the repair constructions.
- Controlling of cone with propellor.
The conversion operations consists of:
- Inspection of two gearboxes on board.
- Controlling and recording of the alignment of the input and output shaft.
- A visual inspection and friction of the inside gearbox.
The conversion operations consists of:
- Inspection of two gearboxes on board.
- Controlling and recording of the alignment of the input and output shaft.
- A visual inspection and friction of the inside gearbox.
The conversion operations consists of:
- A visual inspection of the gearbox with the aid of a videoscope.
- Deploying of the inspection report.
- Stop point.
Disassembly of the gearbox
Disassembling of the gearbox took 1 day without facing major issues.
Transporting of parts to our workshop
The pinion as well as the bull gear were transported to the workshop of the shipyard.
Hoisting points needed to be welded on the ceiling of the pump motor room.
The conversion operations consists of:
- A visual inspection of the gearbox.
- Performing of the repair constructions.
- Deploying of the inspection report.
The conversion operations consists of:
- Performing of an alignment check on the dredge pump gearbox on location.
For the alignment check, a laser shaft alignment system was used.
With this system, the alignment of equipment can be measured accurately.
- Deploying of the inspection report.
The conversion operations consists of:
- Performing of an alignment check on the dredge pump gearbox on location.
For the alignment check, a laser shaft alignment system was used.
With this system, the alignment of equipment can be measured accurately.
- Deploying of the inspection report.
We performed an inspection and repair on a gearbox CONRAD STORK 2R910 S/3 Spec.
STORK 2R910 S/3 Spec.
We performed an inspection and repair on a gearbox CONRAD STORK RB-355BL S/3.
STORK RB-355BL S/3
We performed an inspection and repair on a gearbox CONRAD STORK B3DH8B.
CONRAD STORK B3DH8B
We performed an inspection and repair on a gearbox CONRAD STORK 2R910 S/3 Spec.
STORK 2R910 S/3 Spec.
GBS Lasercladden
- Deploying of the inspection report.
- Stop point.
LIPS FT09
Our client had a problem with the gearbox RENK SHSI 3S 1000.
We performed:
- Disassembling and inspection.
- We assembled the complete gearbox again and performed a test run.
We performed:
- Disassembling and inspection.
- We assembled the complete gearbox again and performed a test run.
RENK SHSI-3S-1000
- Performing of the repair constructions.
- Deploying of the inspection report.
HANSEN RLC-23-S
- Performing of the repair constructions.
- Renewing of the seals and bearings.
HANSEN PDC23S-BNN-14,5
- Performing of the repair constructions.
- Deploying of the inspection report.
HANSEN RLD-33-S-BRH-20
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
Gearbox casing:
- A visual inspection of the gearbox casing for bursts.
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
CONRAD STORK 2-RT-800S/3
Revisionconstruction and supply comprehensive:
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
Gearbox casing:
- A visual inspection of the gearbox casing for bursts.
- Disassembling and cleaning of the gearbox.
- Inspection of all parts of the gearbox:
CONRAD STORK Ra-450-3S
The follow instructions were produced at the gearbox:
Disassemling and cleaning of the gearbox.
Inspection of the parts consisting of the following instruction:.
Gearbox casing (on board):
- A visual controlling of the gearbox for bursts, where possible.
- A visual controlling of the inside and the outside of the preservation.
- A visual controlling of the inside and the outside of the preservation.
CONRAD STORK RB-450H/3
- Performing of the repair constructions.
- Controlling of cone with propellor.
LIPS FT09-HB
- Controlling and recording of the alignment of the input and output shaft.
- A visual inspection and friction of the inside gearbox.
CONRAD STORK RB-450H/3
- Controlling and recording of the alignment of the input and output shaft.
- A visual inspection and friction of the inside gearbox.
CONRAD STORK 3R-320/Spec
Our client had a problem with the gearbox JAHNEL & KESTERMANN ASU 560.
We performed:
- Disassembling, inspection and cleaning.
- We assembled the complete gearbox again and performed a rest run with a test run report for our client.
We performed:
- Disassembling, inspection and cleaning.
- We assembled the complete gearbox again and performed a rest run with a test run report for our client.
JAHNEL KESTERMANN ASU 560
- Deploying of the inspection report.
- Stop point.
MASSON MMW-5200
Hoisting points needed to be welded on the ceiling of the pump motor room.
FLENDER 401-912-830-022-2
- Performing of the repair constructions.
- Deploying of the inspection report.
BRUSSELLE M.90-1-0
We repaired all seals and bearings and the slow axis of gearbox Lohmann & Stolterfoht GJZ 1323.
The follow instructions were produced at the gearbox:
- Wearing part ring was renewed.
- The toothing of the pinion had sharp borders. These were manual purified.
- The slow axis is renewed.
The follow instructions were produced at the gearbox:
- Wearing part ring was renewed.
- The toothing of the pinion had sharp borders. These were manual purified.
- The slow axis is renewed.
LOHMANN & STOLTERFOHT GJZ-1323
For the alignment check, a laser shaft alignment system was used.
With this system, the alignment of equipment can be measured accurately.
- Deploying of the inspection report.
RENK NHIU
For the alignment check, a laser shaft alignment system was used.
With this system, the alignment of equipment can be measured accurately.
- Deploying of the inspection report.
JAHNEL KESTERMANN DP-A1S940-3S-00
We performed an inspection in gearbox Jahnel Kestermann.
The teeths were slightly damage so we regrind them.
We did repair the bearings and seals.
The teeths were slightly damage so we regrind them.
We did repair the bearings and seals.
JAHNEL KESTERMANN E420 / 800
- Inspection on gearbox Kuypers 6021-7.
- Installation of this gearbox.
- Test run to check if everything was alright.
- Installation of this gearbox.
- Test run to check if everything was alright.
KUYPERS 6021-7