GBS Gearbox Services international brand of Schaaf- en Boorwerk Rotterdam B.V.
Emergency Hotline
SEW SSG 5

Overhaul of gearbox SEW SSG 5

Overhaul of gearbox SEW SSG 5

  • SEW
  • SSG-5
  • Input=___ rpm / ____ KW
  • SEW gearbox repair
  • NL

Scope of work:

We performed an inspection and repair on a gearbox SEW SSG-5.

The conversion operations consists of:

  • Performing a standard overhaul your gearbox, including visual inspection on site with an endoscope through a threaded hole.

  • The standard overhaul consists mainly of:
  • • General cleaning and disassembly of all components.
    • Inspection and reporting. (stop point)
    • The drawing up of the entire inside, including geometry of the
    teeth.
    • Assembly and testing.

  • Turnaround gearbox overhaul:
  • • The inspection will be within 3 days after delivery gearbox
    ready.
    • The time required by us to carry out revision work will be
    reported in inspection report aswell as associated costs
    for revision.

  • Refurbishment works and supplies including:
  • • The information you provide to gearbox completely dismantle and
    cleaning.
    • Inspecting the components comprising:

  • Cabinet House:
  • - The visual check of the closet at home cracks, where possible.
    - Checking the preservation of visual internal and external.
    - Checking the drilling damage and sizes.

  • Inside:
  • - Checking condition of the teeth of all the gearing.
    - Checking the bearings for damage phenomena.
    - The check images and flank wear twists of all gearing.
    - Checking the Asmat t.p.v. the bearings, oil seals, gears and
    links to dimensions and lesions.

    • The renewal of the bearings and seals, supply SB Worldwide
    • Update of various consumables like gaskets, mountings,
    etc, supply SB Worldwide
    • The refit of the gearbox.
    • If necessary, machining the surfaces of the bearing covers
    to get the correct axial bearing clearances.
    • Monitoring and recording of images and flank wear twists in the
    inspection.
    • Monitoring and recording of the axial clearances in the
    inspection.
    • Bench test preparations, gear preparation, fill with oil and no-
    load test for 4 hours, at which this decline will be presented to a
    representative Sitech Manufacturing Services.
    • Gearbox ready for shipment.
    • The delivery within 2 weeks after sending a complete overhaul
    file containing the report form, trial protocol and turn drawings
    (DWG) of the inside.



contact us

Location - date:

The Netherlands - September 2009

Other types of same brand: